JUN-2021

ELENA biomethane plant was commissioned.

    • Location: Parc de L’Alba of Cerdanyola – Barcelona
    • Energy injection into the NEDGIA gas grid: 12 GWh/year
    • Origin: Landfill

https://www.europapress.es/economia/energia-00341/noticia-naturgy-realiza-primera-inyeccion-gas-renovable-vertedero-red-distribucion-espana-20210610103342.html

SEP-2021

UNUE biomethane plant was commissioned.

    • Location: P.I. Villalonquéjar – Burgos
    • Energy injection into the NEDGIA gas grid: 20 GWh/year
    • Origin: Agroindustrial

https://www.diariodeburgos.es/noticia/ZD8A756CE-BC3E-36C0-E7A667C9FDA7F8DA/202111/la-primera-planta-privada-de-biometano-de-espana-en-burgos

DEC-2021

TORRE SANTAMARIA biomethane plant was commissioned.

    • Location: Vallfogona de Balaguer – Lleida
    • Energy injection into the NEDGIA gas grid: 30 GWh/year
    • Origin: Livestock

https://www.energias-renovables.com/bioenergia/la-granja-torre-santamaria-comienza-a-inyectar-20220207

JAN-2022

EDAR BENS biomethane plant was commissioned.

    • Location: Bens – A Coruña
    • Energy injection into the NEDGIA gas grid: 5 GWh/year
    • Origin: Waste-water treatment plant

https://www.farodevigo.es/sociedad/2022/02/03/residuo-recurso-gas-fuente-renovable-62008717.html